Paving and Shouldering of Municipal Streets

Issue Date
Closing Date and Time
Contact information
Summary

The District of Fort St. James is seeking proposals from qualified Proponents to re-pave approximately 2500 linear meters of Municipal streets. All paving must be completed between August 1, 2026 and August 31, 2026. Paving will consist of paving a 50mm layer on top of existing asphalt, tie ins to driveways and intersections, grinding as required and shouldering of all streets paved must be included in bids. Water service lines are being replaced at each address shown on drawings within Appendix C, but asphalt is only being removed for the excavation site where it intersects the street, and not the entire street surface. 

Further details as to the scope of this opportunity and the requirements can be found within this RFP in Appendix C.

Opportunity ID
RFP26-03